• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to secondary sidebar

The Lincoln Squirrel – News, features and photos from Lincoln, Mass.

  • Home
  • About/Contact
  • Advertise
  • Legal Notices
    • Submitting legal notices
  • Lincoln Resources
    • Coming Up in Lincoln
    • Municipal Calendar
    • Lincoln Links
  • Merchandise
  • Subscriptions
    • My Account
    • Log In
    • Log Out
  • Lincoln Review
    • About the Lincoln Review
    • Issues
    • Submit your work

school project*

Workshops on school campus scheduled

September 11, 2017

There will be two community workshops on October 3 where residents can learn about and discuss options for the Ballfield Road campus.

Residents are invited to part or all of two “Developing a Shared Vision for our Campus” workshops on Tuesday, Oct. 3 from 8–10 a.m. and 7–9 p.m. Both will be in the Reed Gym. Children are welcome and refreshments will be served.

The Lincoln School and the Ballfield Road campus grew over time between 1948 and 1994 as parcels of land were added and building projects completed. The last major addition to the campus occurred in 1994, when a school project connected the Smith and Brooks buildings, creating a unified K-8 school.

Now, as a community, Lincolnites have the opportunity to create a holistic plan for the campus. Between the work of the School Building Committee (SBC) and the Community Center Preliminary Planning & Design Committee (PPDC), every aspect of the campus is under consideration: the Lincoln School, preschool programs, after-school programs, a potential community center for the Parks & Recreation Department and the Council on Aging, playing fields, roadways, walking and bike paths, and parking lots. This workshop is designed to begin thinking about the space needed for all these pieces and where they fit on the campus.

A brief history of the campus can be found on the new SBC website, which aims to document and detail every aspect of the school project. To subscribe for automatic email updates from the site:

  1. Visit lincolnsbc.org
  2. Scroll down to “Subscribe to SBC Updates” in the white box on the left
  3. Type your email address where indicated and hit “subscribe”

You’ll then receive an email from the Lincoln School Building Project asking you to confirm your subscription; please click on “Confirm Follow.”

Anyone questions or comments may email SBC@lincnet.org.

Category: school project*, schools, seniors, sports & recreation Leave a Comment

Group aims to keep two building project committees aligned

September 10, 2017

The Campus Coordinating Group (CCG), which met for the first time on September 7, will begin work on an overarching timeline that lays out joint milestones and public workshops and charrettes for the Community Center Preliminary Planning & Design Committee (PPDC) and the School Building Committee (SBC).

The CCG was formed so the members of the two groups working on planning for a school project and a community center can keep each other up to date on their progress. It includes three members of the SBC (Superintendent Becky McFall; Chris Fasciano, chair; and Craig Nicholson) and three members of the PPDC (Tim Higgins, town administrator; Ellen Meyer Shorb, chair; and Owen Beenhouwer).

The next meeting of the CCG is Thursday, Sept. 14 at 7:30 a.m. in McFall’s office (second floor of the Hartwell building). After that, the group will meet at 7:30 a.m. on Thursday mornings every other week. All meetings are open to the public.

Category: community center*, government, news, school project*, schools Leave a Comment

School Committee selects dual-firm design partnership

August 27, 2017

By Kim Bodnar, SBC member

The School Committee voted last week to approve the School Building Committee’s recommendation to enter into negotiations with Symmes, Maini and McKee Associates (SMMA) of Cambridge, which has entered into a collaborative partnership with EwingCole for the purposes of designing a Lincoln School project.

SMMA has extensive knowledge of the Ballfield Road campus, having completed a conditions analysis of the Lincoln School and Hartwell buildings in 2006-07. For this project, the firm is teaming up with Philadelphia-based EwingCole, which designed the new Hanscom Middle School (which opened in April 2016) and the new Hanscom Primary School (currently under construction). The start of SMMA/EwingCole’s work on the Lincoln School project is subject to the successful negotiation of a contract.

The interview and selection process for the five finalists took many hours over two evenings. The School Building Committee (SBC) thanks all the community members who attended the sessions and provided invaluable input. Their involvement in the process and candid feedback was greatly appreciated.

Earlier this summer, the SBC asked residents to complete a survey entitled “Shaping our Town’s Evaluation Criteria” and received 364 responses. Below is a summary of those responses.

1.  “We should maintain the current L-shaped footprint of school.”
  • 64% neutral, 15% disagree/strongly disagree, 12% agree,  9% strongly agree
2.  “We should take a blank-slate approach to the design.”
  • 33% strongly agree, 32% agree, 20% neutral, 15% disagree/strongly disagree
3.  “We should consider all new construction.”
  • 33% agree, 26% strongly agree, 21% neutral, 20% disagree/strongly disagree
4.  “The primary focus of the project is a design that focuses on our educational vision.”
  • 48% strongly agree, 35% agree, 12% neutral, 5% disagree/strongly disagree
5.  “The primary focus of the project is to make repairs and meet code.”
  • 27% disagree, 23% strongly disagree, 19% agree, 16% neutral, 15% strongly agree
6.  “The project should reach high energy efficiency standards.”
  • 42% agree, 39% strongly agree, 13% neutral, 6% disagree/strongly disagree
7.  “Adding additional recreation fields is important.”
  • 38% neutral, 33% agree, 15% strongly agree, 10% disagree, 4% strongly disagree
8.  “Building safety and security are a primary consideration.”
  • 41% agree, 26% neutral, 25% strongly agree, 8% disagree/strongly disagree
9.  “We need to minimize construction time.”
  • 42% neutral, 27% agree, 15% disagree, 12% strongly agree, 4% strongly disagree

When respondents were asked to rank the criteria mentioned in Questions 1-9 in order of importance, educational vision was #1, energy efficiency was #2, and building safety and security was #3.

The next School Building Committee will be held on Wednesday, Aug. 30 at 7 p.m. in the Hartwell multipurpose room (click heree for the agenda). All are welcome to attend. Anyone with questions or comments may email sbc@lincnet.org.

Category: school project*, schools Leave a Comment

News from the School Building Committee

August 2, 2017

Below are the latest updates from the the School Building Committee (SBC), which continues to meet throughout the summer:

  • There will be a tour of the new Hanscom Middle School with SBC members on Wednesday, Aug. 9 from 7–9 p.m. For Hanscom Air Force Base security purposes, those interested in attending must provide their full legal name and birthdate to Janice Gross (jgross@lincnet.org) by noon on Thursday, Aug. 3.
  • Daedalus Projects, Inc. has been hired as the Owner’s Project Manager (OPM). The OPM serves as the town’s advocate and helps communicate the planning process to the community and keep the Lincoln School project on schedule and on budget.
  • The Outreach Subcommittee is reviewing feedback from the 364 “Shaping Our Town’s Evaluation Criteria” survey responses that were submitted and will provide a summary in the next few weeks.
  • SBC member Craig Nicholson was appointed as a liaison to the Campus Coordinating Group, joining SBC Chair Chris Fasciano and Superintendent Becky McFall. The group was authorized by the Board of Selectmen and the School Committee to facilitate collaboration between the SBC and the Community Center Planning and Preliminary Design Committee.
  • Five design firms have been selected as finalists for the Lincoln School project. The finalists will be interviewed on the evenings of August 15 and 16 starting at 6 p.m. in the Hartwell multipurpose room. The interviews are open to the public.
  • The Outreach Subcommittee will meet on Thursday, Aug. 3 from 5-6:30 p.m. in the Hartwell Multipurpose Room and will begin discussions about creating the Lincoln School Project website. All are welcome to attend.

For more information, see the SBC web page. Questions or comments may be emailed to SBC@lincnet.org.

Category: news, school project*, schools Leave a Comment

Residents offer thoughts on school project priorities and goals

July 5, 2017

The School Building Committee has released a summary of the hopes and priorities for the school building project expressed by residents at the committee’s kickoff meeting on June 14.

About 40 residents at the meeting answered a series of four questions during a participation activity after the SBC outlined its timeline and asked for community input. Since then, the committee has also received more than 250 responses to an online survey on “Shaping Our Town’s Evaluation Criteria,” which is open until July 15. The video of the meeting (minus the activity session) is here.

The questions and most frequent answer are below.

Question 1: The Lincoln School is important to the community because…

  1. it is the heart of the community
  2. education is a core value
  3. the physical campus is an important meeting place for both young families and older adults
  4. it generates civic pride
  5. it educates our future leaders
  6. education is the foundation of the community and central to the quality of life

Question 2: I would like the opportunity to…

  1. improve the educational environment
  2. have an environmental sustainability in building
  3. see the total town coming together to make a decision
  4. have significant input at several points along the way
  5. understand decisions; understand how input is handled
  6. to get all school information to all Lincoln citizens at all times

Question 3: When developing the design of the Lincoln School, the primary focus should be on…

  1. a welcoming, comfortable, safe atmosphere. Affirm student, faculty, and community dignity through use of materials, natural light, textures, color, etc.
  2. flexible space in support of student and faculty experience
  3. a structure that encourages community and collaboration
  4. design—effectiveness for variety of needs at acceptable cost
  5. educational program augmented by well-designed spaces which promote Lincoln’s values of community, conservation, and history
  6. integrating the building into the greater campus (roads, sidewalks, fields, etc.)

Question 4: I hope that the School Building Committee will consider ….

  1. the educational mission that Becky McFall has been sharing regarding 21st-century learning spaces
  2. making sustainability a top priority from the get-go
  3. a building that supports the progression of grades and makes sure all kids have access to the outdoors
  4. practicality—”do not let perfection be the devil of getting it done”
  5. really listen to the input from the town and all the past work that has been done
  6. having the project design led by energy efficiency

To obtain the full set of responses, email sbc@lincnet.org.

The next SBC meeting is Wednesday, July 12 at 7 p.m. in the Hartwell multipurpose room. The agenda will be posted here.

Category: news, school project*, schools Leave a Comment

School Building Committee offers timetable, urges public input

June 20, 2017

The School Building Committee held its first public forum last week to outline initial steps and emphasize the need for community input and participation in coming up with a school design that voters can eventually approve.

This summer, the SBC will interview, select and negotiate with an architect and owner’s project manager. Part of its work will involve close coordination with the Community Center Preliminary Planning and Preliminary Design Committee (CCPPDC), which is working in parallel with the SBC on a feasibility study for a community center on the school campus. To that end, the Board of Selectmen and School Committee have authorized a Campus Coordination Group to facilitate collaboration between the SBC and the CCPPDC. Members are Superintendent of Schools Becky McFall, Town Administrator Tim Higgins, the chairs of the PPDC and the SBC, or designees, and one other member of the SBC and CCPPDC.

The SBC hopes to develop preliminary design options starting in the fall, with a town vote to choose one of the designs in the spring. If all goes well, the next steps are producing detailed shcematic drawings and thn another town vote on bonding the project in November 2018.

Among the issues that the SBC will tackle early on are where the various functions of the school campus should go (for example, the Lincoln After-school Activities Program, school administration offices, pre-K classrooms and storage); what a “green” or “net zero” building might involve, and what roles that other boards and committees will play.

“We need your help—I can’t stress it enough,” SBC Chair Chris Fasciano said at the June 14 forum. “To bring this project to fruition, it has to be a community project. Not everyone is going to get what they want, but in order for it to succeed, the community has to embrace the process and help us get there.”

Gina Halsted, a member of the SBC Outreach Subcommittee, outlined the various avenues of communication the SBC will use, including social media and LincolnTalk as well as mailings, workshops, forums, coffees, and other traditional methods. Meetings are also live-streamed and recorded for later online playback on the town’s video website, and all meetings are open to the public. Agendas, minutes and other documents can be found here.

Halsted invited residents to submit comments or questions by email to sbc@lincnet.org, though she cautioned that “we can’t respond [via email or social media] unless it’s in a very factual way” due to the requirements of the state’s open meeting law.

The SBC has also posted an online survey asking about residents’ priorities for a school project (building shape, repairs vs. new construction, etc.) as well as how they preferred to informed. The survey is open until July 15.

Category: government, school project*, schools Leave a Comment

School Building Committee to discuss public forum, timeline

May 30, 2017

At its meeting on Wednesday, May 31 at 7 p.m. in the Hartwell multipurpose room, the School Building Committee (SBC) will discuss plans for a June 14 public forum, communications with other town boards and committees, and the committee’s timeline. The full agenda can be found here.

In its two previous meetings, SBC members introduced themselves to each other and elected Chris Fasciano as chair and Kim Bodnar as vice chair. The panel also named an Outreach Subcommittee (Kim Bodnar, Selectman Jennifer Glass and Gina Halsted), and SBC members Buck Creel, Craig Nicholson and Peter Sugar volunteered to begin drafting a request for services (RFS) for the owner’s project manager (OPM).

Residents are welcome to come to part or all of the SBC’s meetings. Anyone who has questions or comments for the SBC to address at a future meeting is welcome to send an email to sbc@lincnet.org (back-and-forth email discussions about SBC business are prohibited by the state Open Meeting Law).

Category: government, school project*, schools Leave a Comment

Community center, school group both seeking more residents

May 23, 2017

The School Building Committee (SBC) is seeking volunteers for an Outreach sub-committee. The Outreach Team’s focus is to communicate SBC updates and key community forum details, but also to warmly welcome community input in all our outreach messages and encourage engagement from our residents. The time commitment of our committee members will vary and depend on the role the volunteer chooses, for there are many. Please volunteer if you…

  • Are interested in acting as a neighborhood “captain” to ensure SBC communications reach your neighborhood
  • Would like to be involved in hosting coffees or small group community sessions
  • Have an expertise in updating and managing website content
  • Have an expertise in photography or videography
  • Would like to be involved in communicating community forum details and listening sessions to encourage greater community engagement.

If you’d like to volunteer or just learn more about this subcommittee, please email SBC@lincnet.org.

Community center panel

Selectmen are still seeking candidates to serve on the CCPPDC who have experience in fields that are relevant to the committee’s work, such as architecture, planning or design, project management, or community engagement. There will be four at-large community members on the committee. More information on the committee’s duties can be found here.

Those interested should send letters of interest (mentioning relevant experience) to the Board of Selectmen via email to at ElderP@lincolntown.org by Friday, June 2. The board will appoint members of the CCPPDC at its meeting on June 12. The committee will hold its first meeting the following week and will present public updates (including at the fall 2018 State of the Town meting). If possible, there will be a final report and/or town vote at the spring 2018 Town Meeting.

Category: community center*, government, news, school project*, schools, seniors Leave a Comment

School Building Committee holds first meeting

May 4, 2017

The new School Building Committee, appointed by the School Committee on April 11, held its first meeting on May 3. Members voted to appoint Chris Fasciano as chair, Kim Bodnar as vice chair, and Selectman Jennifer Glass as secretary.

As outlined in its charge, the SBC will create a feasibility study resulting in plans and cost estimates for a Lincoln School renovation project costing at least $30 million. In March, voters approved releasing $750,000 to fund work by consultants the group will hire. The group will work closely with a community center building committee, which will be producing its own feasibility study.

The SBC’s next meeting will be Wednesday, May 17 at 7 p.m. in the Hartwell multipurpose Room. The tentative agenda includes a review of a draft Request for Services (RFS), the first step in the hiring of an owner’s project manager. A subcommittee comprising Creel, Nicholson, and Sugar is preparing the draft for review by the full committee.

Members of the SBC are:

  • Becky McFall, Superintendent of Schools
  • Buckner Creel, Lincoln Public Schools Administrator for Business and Finance
  • Michael Haines, Town Facilities Manager
  • Sharon Hobbs, Brooks School Principal
  • Timothy Christenfeld, School Committee
  • Jennifer Glass, Board of Selectmen
  • Gina Halsted, Finance Committee
  • Kimberly Bodnar, community member
  • Chris Fasciano, community member
  • Craig Nicholson, community member
  • Steven Perlmutter, community member
  • Peter Sugar, community member

The following liaisons were also appointed by their respective organizations, with more expected:

  • Doug Adams, Liaison, Historic Commission
  • Ed Lang, Liaison, Green Energy Committee
  • John Ritz, Liaison, Lincoln Council on Disabilities
  • Ian Spencer, Liaison, Public Safety
  • Gary Taylor, Liaison, Planning Board

Category: government, news, school project*, schools Leave a Comment

School Building Committee charge approved; members sought

April 13, 2017

The School Committee is officially seeking four or five community members for a new School Building Committee after voting to create the panel and approving its charge on April 12.

The new SBC will work closely with a community center building committee, whose charge will be discussed by selectmen at their April 24 meeting. Voters last month approved funding feasibility studies for both school and community center projects on the Ballfield Road campus.

The School Committee is seeking four or five community members with experience in fields that are relevant to the SBC’s work, such as architecture, planning or design, project management, or community engagement. Potential candidates should email letters of interest, mentioning relevant experience to the SC at schoolcomm@lincnet.org. The deadline for SBC candidate submissions is Monday, April 24, and the SC will appoint members at its April 27 meeting. The new SBC will hold its first meeting the following week.

The SBC’s charge includes hiring an owner’s project manager and design firm, detailing space requirements for the educational program, creating a plan for communications and community input, preparing at least three design solutions with cost estimates for review and vote by Town Meeting, and developing a partial schematic design and specific cost estimate for the preliminary design selected at that Town Meeting.

“The School Committee promises that membership on the SBC will entail long hours, hard work, difficult conversations, no pay, and uncertain rewards. It also offers an opportunity to participate in the creation of a central piece of the community and the future of this town,” the committee wrote. Residents who would like to discuss the responsibilities and expectations of SBC membership are encouraged to email the SC at the same address.

The exact mechanisms for how the two building committees will work together haven’t been worked out yet, though selectmen discussed the issue at their April 11 meeting with SC members. For example, the groups would have to decide early on whether to hire a design firm with two separate teams (one for the school building and the other for a community center), a single design team, or two separate firms.

With two teams in a single a company, “you have that kind of built-in collaboration in a much easier way,” Selectman James Craig said.

Another suggestion was having one or more residents be members of both groups, “but that seems like a herculean task,” Craig said. Selectman Jonathan Dwyer suggested a “wrapper” group “so the two teams don’t have their silos and it’s more like one team with a single mission.”

“As much as you all may try, without some codified organizational structure to overcome it, the notion of collaboration when the rubber hits the road and dollar signs start flying around is going to get really tough,” former Selectman Sara Mattes said in the meeting’s open forum. “To me, in past experience, liaisons alone don’t do it. Maybe this will be magical and there’s enough good will to carry it forward, but we have some tough slogging ahead and some really important big-ticket projects ahead of us.”

Mattes suggested a five-person executive committee with a member from each of the building committees plus one each from the Board of Selectmen, School Committee, and either Finance Committee or Capital Planning Committee. Such a group could assure various constituencies such as the Green Energy Committee that “they’ve got another sounding board and sort of a mediator in the process,” she said.

Whatever the firm or firms are hired for the two projects will be required to solicit and incorporate substantial public input all along the way.“Whatever you think is normal outreach, double it and be creative,” said Selectman and recent SC chair Jennifer Glass.

Category: government, school project*, schools Leave a Comment

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10
  • Interim pages omitted …
  • Page 14
  • Go to Next Page »

Primary Sidebar

Recent Posts

  • Water bills to go up by 13% March 5, 2026
  • News acorns March 5, 2026
  • Property sales in January 2026 March 4, 2026
  • My Turn: Unraveling the Hanscom misallocation March 3, 2026
  • Police log for Feb. 19–25, 2026 March 3, 2026

Squirrel Archives

Categories

Secondary Sidebar

Search the Squirrel:

Privacy policy

© Copyright 2026 The Lincoln Squirrel · All Rights Reserved.