• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to secondary sidebar

The Lincoln Squirrel – News, features and photos from Lincoln, Mass.

  • Home
  • About/Contact
  • Advertise
  • Legal Notices
    • Submitting legal notices
  • Lincoln Resources
    • Coming Up in Lincoln
    • Municipal Calendar
    • Lincoln Links
  • Merchandise
  • Subscription Info
    • My Account
    • Log In
    • Log Out
  • Lincoln Review
    • About the Lincoln Review
    • Previous Issues
    • Submit Your Work
    • Subscribe/Donate

Town Office Building wins LEED Silver energy efficiency staus

July 2, 2015

The Lincoln Town Office Building

The Lincoln Town Office Building

The renovated Lincoln Town Office Building has won LEED Silver certification for energy efficiency, which is a vast improvement over the days when officials had to use space heaters in winter and stifle in the summer.

To receive LEED certification from the U.S. Green Building Council, building projects must satisfy prerequisites and earn points to achieve different levels of certification (platinum, gold, silver and “certified”). Since the renovation was completed in 2013, the building is now 35 percent more energy efficient than the average building, according to a press release from Donham & Sweeney Architects, which designed the renovations.

Though there won’t be a special LEED float in the Fourth of July parade, Eckhouse will announce the LEED certification before the Declaration of Independence is read, and the Board of Selectmen float will acknowledge it as well, he said.

There were limits in how “green” the building could get because of its historic nature and a reluctance to go  as far as installing composting toilets and exclusively natural ventilation, said Selectmen Noah Eckhouse. Still, “we always knew LEED certification was a goal form the start in our design philosophy,” he said.

The old building had extremely inefficient heating and insulation and no air conditioning, meaning that around this time of year, people at Board of Selectman meetings would be sticking to their seats, Eckhouse said. And though it’s also a nice decorative touch, the cupola was primarily intended to vent hot air and allow cooler air to enter the building from below, he added.

LEED certification for the former schoolhouse was based on green design and construction features including:

  • Modern energy-efficient lighting
  • Water efficiency measures that save an estimated 160,000 gallons of water each year, and a reduction in storm water runoff
  • Exterior lighting designed to maintain the dark night sky
  • Regionally extracted, processed, and manufactured construction products, including brick, concrete block, structural steel, slate shingles, copper items, light gage metal framing, plywood and composite board veneer panels, drywall, and toilet partitions
  • Reuse of more than 75 percent of the original building’s exterior walls, floors, roof structure, and roofing
  • Recycled and regionally sourced interior materials and finishes
  • Designated parking spaces for low-emitting and fuel-efficient vehicles

There were also some features that exceeded the project’s LEED requirements, including the use of green power, educational outreach to the community, the use of environmentally safe cleaning products, and low mercury products.

Category: news Leave a Comment

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Upcoming Events

Apr 29 Wed
2:45 pm - 4:30 pm

Speed painter Rob Surette

Apr 29 Wed
6:30 pm - 7:30 pm

Unmasking Women in Crisis

Apr 30 Thu
3:00 pm - 4:00 pm

Jazz Concert with 2Slick

May 1 Fri
12:30 pm - 1:30 pm

Author talk: “The Harvey Girls”

May 6 Wed
6:00 pm - 8:00 pm

Plant-based potluck

View Calendar

Recent Posts

  • News acorns April 26, 2026
  • My Turn: Speakers offer information and suggestions on immigration issue April 23, 2026
  • Legal notice: ZBA (May 7, 2026 hearing) April 23, 2026
  • Photo exhibit of Mt. Misery beavers opens Friday April 22, 2026
  • News acorns April 21, 2026

Squirrel Archives

Categories

Secondary Sidebar

Search the Squirrel:

Advanced search

Privacy policy

© Copyright 2026 The Lincoln Squirrel · All Rights Reserved.