By Dan Boynton
Route 2 Oversight Committee
The massive Route 2 safety upgrade project in Lincoln is about to enter a new construction phase. Up to this point, all the work has been outside the boundaries of the highway. New access roads have been constructed to serve homes abutting Route 2 and the beginning stages of the flyover bridge have been built on land opposite Crosby Corner. Although the highway has often been reduced to just one lane in each direction during off-peak hours, all four lanes have been available during commuter times.