• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to secondary sidebar

The Lincoln Squirrel – News, features and photos from Lincoln, Mass.

  • Home
  • About/Contact
  • Advertise
  • Legal Notices
    • Submitting legal notices
  • Lincoln Resources
    • Coming Up in Lincoln
    • Municipal Calendar
    • Lincoln Links
  • Merchandise
  • Subscription Info
    • My Account
    • Log In
    • Log Out
  • Lincoln Review
    • About the Lincoln Review
    • Previous Issues
    • Submit Your Work
    • Subscribe/Donate

Care Dimensions returns with downsized hospice proposal

May 27, 2014

The original (top) and revised plans for the Care Dimensions hospice facility on Winter Street.

The original (top) and revised plans for the Care Dimensions hospice facility on Winter Street.

By Alice Waugh

Care Dimensions has submitted a downsized plan for an inpatient hospice facility on Winter Street that calls for a building in the plan that’s 35 percent smaller than the first one reviewed by the Zoning Board of Appeals in March.

In response to objections from neighbors and the ZBA at the board’s March 6 meeting, Care Dimensions downsized the floor area of the two-story building from 42,400 to 27,600 square feet (with a footprint of 24,850 vs. 14,800 square feet), the building facade from 350 to 207 feet, and the number of beds from 20 to 18. It also increased the building’s distance to the nearest abutter from 215 to 402 feet and the distance to Winter Street from 93 to 122 feet.

Compared to its first proposal, the new plan also calls for a 20 percent reduction in traffic volume and 25 fewer parking spaces (64, down from 89. Care Dimensions says its revised plan is compliant with the Dark Skies Initiative, with six lighting fixtures apiece in the parking lot and driveway, reduced from 12 and nine respectively, and a change from lantern-style to bollard-style lights. There will be one to three ambulance trips each day to and from the facility with no sirens used, according to the plan.

The ZBA hearing on the latest proposal will take place on Thursday, June 5 at 7:30 p.m. in the Town Office Building.

Category: hospice house*, news Leave a Comment

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Upcoming Events

Apr 24 Fri
12:30 pm - 2:30 pm

Movie: “The Patriot”

Apr 25 Sat
6:30 pm - 8:30 pm

Free wine/beer-tasting to aid DVR

Apr 26 Sun
2:00 pm - 4:00 pm

Earth Day walk to Walden Pond

Apr 29 Wed
2:45 pm - 4:30 pm

Speed painter Rob Surette

Apr 29 Wed
6:30 pm - 7:30 pm

Unmasking Women in Crisis

View Calendar

Recent Posts

  • Legal notice: ZBA (May 7, 2026 hearing) April 23, 2026
  • Photo exhibit of Mt. Misery beavers opens Friday April 22, 2026
  • News acorns April 21, 2026
  • Service in June for Tim Barclay April 21, 2026
  • Legal notice: Conservation Commisson public hearing (29 Lincoln) April 21, 2026

Squirrel Archives

Categories

Secondary Sidebar

Search the Squirrel:

Advanced search

Privacy policy

© Copyright 2026 The Lincoln Squirrel · All Rights Reserved.